Morgnec Solar in Kent County, Maryland

FAQs

Frequently Asked Questions

Thank you for your interest in Morgnec Solar. If your question is not covered in the FAQ below, please submit a question on the contact page and we will be sure to respond.

Renderings of Soapstone Solar from Roadways

Soapstone Solar on Audley Farm was carefully sited to minimize or completely obscure any views of the project from roadways.

Take a Video Site Tour of Monarch Solar . . .

PROJECT LOCATION

Morgnec Solar is located in central Kent County, just east of Chestertown. The project is situated in a remote location, but to ensure low visibility for area residents and from local thoroughfares, a vegetative buffer will be planted along the project boundary. The project will interconnect to the power grid via an existing Delmarva Power Substation, located immediately adjacent to the project site.
The land is owned by a private member of the Kent County Community.

SAFETY & OPERATIONS

Solar panels, also known as photovoltaic modules (PV modules), work by turning sunlight into direct current (DC) electricity. These panels are supported by some type of racking structure that can be fixed, or it may rotate on an axis. Solar panels are paired with inverters that convert the DC electricity into a more useable form of electricity known as alternating current (AC.) The AC electricity then passes through a transformer to ensure that the power is the appropriate voltage before it is sent to the electric grid.
When the solar facility is no longer efficient, the system will be decommissioned and the equipment removed, recycling everything that can be recycled, and returning the land to the condition in which it existed prior to the installation of the solar project. Solar has a minimal impact on the land, unlike fossil fuel power plants. When the project is removed, the land is returned to essentially its original state. Many landowners see leasing land for utility-scale solar projects as a form of land banking, as it has minimal long-term impact on the value of the land. Urban Grid assumes all responsibility for decommissioning and places a secure bond with the county in the event that project ownership should change in the future. This means that the county and its residents are NOT responsible for any costs for the removal of a project at the end of its useful life.
Solar panels do not produce noise, but the inverters that change the current of electricity from DC to AC do produce a slight hum that is not audible past the property boundaries. Solar projects are considered quiet neighbors.
Urban Grid utilizes the best available Photovoltaic solar (PV) panel technology for all of our utility-scale projects. These panels are dark in color and are treated with an anti-reflective coating. The purpose of solar panels is to absorb as much sunlight as possible to produce energy efficiently so the point of the panels is to be as minimally reflective as possible. Solar panels are generally less reflective than windows and have been approved by the Federal Aviation Administration for installation on and around airports across the country.

ENVIRONMENT & WILDLIFE

Solar farms do not pose a threat to wildlife. Wildlife studies are an important part of the development process — environmental scientists study proposed sites to ensure that utility-scale solar development minimizes impact to wildlife. Solar projects can also provide important habitat for birds and pollinators like bees and butterflies. We coordinate with, and follow the requirements of many state and federal agencies during the development and permitting process of solar projects. Morgnec Solar will have fencing that is designed to accommodate the migration and movement of local wildlife.
Utility-scale solar projects are required to reduce runoff flow rates, improve water quality, and may actually improve soil conditions by stabilizing the entire project area. Stormwater management plans and calculations are a required part of the solar development and permitting process. These plans are prepared by professional engineers to ensure that projects do not contribute to erosion or flooding.